News

Emergency Treatment Of Electrical System Failure Of Cold Heading Machine

Date: | Read: 2

Emergency Procedures:

- Power Off Inspection: Immediately disconnect the power to heading machine and inspect the electrical system at heading machine price for any obvious faults.

- Backup Control System: If a backup control system is available, switch bolt forging machine to the backup system to continue production.

- Contact Professionals: Contact professional bolt former maintenance personnel for on-site inspection as soon as possible.

Emergency Treatment Of Electrical System Failure Of Cold Heading Machine

This site uses cookies

We use cookies to collect information about how you use this site. We use this information to make the website work as well as possible and improve our services.