Emergency Treatment Of Electrical System Failure Of Cold Heading Machine
Date: | Read: 2
Emergency Procedures:
- Power Off Inspection: Immediately disconnect the power to heading machine and inspect the electrical system at heading machine price for any obvious faults.
- Backup Control System: If a backup control system is available, switch bolt forging machine to the backup system to continue production.
- Contact Professionals: Contact professional bolt former maintenance personnel for on-site inspection as soon as possible.