Emergency Treatment Of Mechanical Component Failure Of Cold Heading Machine
Date: | Read: 2
Emergency Procedures:
- Shutdown Inspection: Immediately shut down cold header and inspect the mechanical components of cold heading equipment. Replace spare parts if necessary.
- Manual Adjustment: If component replacement is temporarily unavailable, manually adjust the clearance to temporarily restore normal operation of the cold heading machine equipment.